Oklahoma County • HDD & Underground Utility Construction

Directional Drilling & Underground Utility Contractors Serving Oklahoma County, Oklahoma

Trinity Boring Solutions delivers horizontal directional drilling (HDD) and trenchless utility construction for gas, water, sewer, electric, fiber optic, and irrigation systems across Oklahoma County — trusted by plumbers, electricians, builders, developers, municipalities, and homeowners in Oklahoma City, Edmond, Midwest City, Del City, Bethany, Nichols Hills, The Village, Warr Acres, and Spencer.

HDD Experts Gas • Water • Sewer
Plumbers & Electricians Trade-Ready Bores
Municipal DOT/OSHA Compliance
Developers Turnkey Trenchless
Statewide Rapid Mobilization
“Your infrastructure. Our direction.” Fast HDD proposals for Oklahoma County projects. Open Quote Form

Trenchless Utility Boring for Gas, Water, Sewer, Electric & Fiber

Our HDD crews deliver safe, precise bores beneath Oklahoma County roads, arterials, rail corridors, campuses, and neighborhoods with minimal surface impact. We coordinate directly with plumbers for gas/water services, electricians for conduit/lighting, and telecom teams for fiber pulls — aligning stub-ups, labels, and inspection-ready documentation to your specs.

  • Pre-Con & Locates: 811 tickets, utility records, on-site verification.
  • Hydro-Vac Daylighting: Pothole critical crossings to confirm depth/material.
  • Bore Plans: Entry/exit, bend radii, cover, conflict avoidance, traffic control.
  • Pilot & Reaming: Locator-guided; staged passes matched to product OD/SDR.
  • Pullback & Proof: Tension control; proof/mandrel; stub-ups labeled for trades.
  • Testing & Closeout: Pressure/hydro tests, fusion logs/weld docs, GPS as-builts.

Who We Work With — Trades & Owners

Plumbers

Service-ready bores for gas & water lines — correct depths, separations, and stub locations for clean tie-ins.

Electricians

Electric conduit, street lighting, and controls with sweeps, vaults, pull strings, and labeling for inspection.

Telecom & ISPs

Fiber backbones and laterals, multi-duct bundles, locatable duct, tracer wire, and proof/mandrel on handoff.

Builders & Developers

Turnkey trenchless for subdivisions, campuses, retail, and industrial sites — minimal disruption and fast restoration.

Municipalities

ODOT traffic control, inspector coordination, pressure/hydro tests, QA/QC logs, and photo documentation.

Homeowners & HOAs

Clean entry/exit pits, neat crossings, restoration-first approach for residential bore needs.

General Contractors

Schedule-driven scopes with clear communication, hazard controls, and zero-surprise change orders.

Energy Clients

Gas transmission/distribution HDD with fusion/weld docs, pressure charts, CP considerations.

Applications — Gas • Water • Sewer • Electric • Fiber • Irrigation

Gas & Energy

Steel and PE mains/services, roadway/rail/creek crossings, with fusion logs/weld docs and pressure charts for inspection.

  • 1″–48″ diameters
  • Frac-out containment
  • CP & required cover

Water & Sewer

HDPE, PVC, DIP — restrained joints & fusible systems. Disinfection and hydro tests with documented results.

  • 2″–36″ mains
  • Air/vac & hydro testing
  • Clean tie-ins

Electric & Fiber

Primary/secondary power, lighting, and fiber multi-duct. Proof/mandrel, tracer wire, labels, and vaults/handholes.

  • ¾″–6″ conduit
  • Multi-duct bundles
  • Locatable duct options

Why Oklahoma County Contractors Choose Trinity

  • Trade-Ready Execution: Bores aligned to tie-in points, correct stub heights, proofed conduits for faster pulls.
  • Minimal Surface Impact: Small pits, clean routes, and restoration that keeps the public safe and inspectors satisfied.
  • Inspector-Ready Docs: Fusion logs, weld/NDE records, pressure/hydro tests, and GPS as-builts.
  • Zero-Surprise Planning: Pre-con walks, hydro-vac daylighting, and clear communication reduce risk.
  • Schedule Discipline: Rapid mobilization with coordinated traffic control and staging.

Common Specs, Diameters & Notes

ApplicationMaterialsTypical SizesNotes
Gas Transmission/DistributionSteel, HDPE1″–48″Weld/NDE or fusion; pressure charting; CP considerations
Potable WaterHDPE, PVC, DIP2″–36″Disinfection; hydro tests; restrained joints; bend radii
Sewer (Force Main)HDPE, Fusible PVC4″–24″Air/vac test; slope & depth checks; corrosion resistance
Electric/LightingPVC, HDPE1″–4″Sweeps, vaults/handholes; labeled stub-ups; code separations
Fiber OpticHDPE SDR, Microduct¾″–2″ (multi)Proof & mandrel; spare duct for expansion; tracer wire
IrrigationHDPE, PVC¾″–4″Neat greenspace crossings; turf care and restoration

Safety, Compliance & Documentation

We build every bore around safety. OSHA programs, DOT/utility standards, ODOT traffic control, frac-out contingency, and spill response are integrated on every job in Oklahoma County.

Crews run checklists for PPE, traffic setup, utility verification, circulation monitoring, and spoil/sediment management. Close-outs include photo logs, test results, and inspector sign-offs.

Coverage — Oklahoma County & Nearby

Serving contractors, trades, and owners across Oklahoma City, Edmond, Midwest City, Del City, Bethany, Nichols Hills, The Village, Warr Acres, and Spencer — with rapid mobilization to neighboring counties.

Connect your Interactive Geo Map to #oklahoma-county-map or insert your shortcode here.

FAQ — Oklahoma County Directional Drilling & Trenchless

Do you work with plumbers and electricians?
Yes. We coordinate with plumbers for gas/water tie-ins and electricians for conduit pulls, lighting circuits, and inspections. We set stub-ups, labels, and pull strings to your specs.
Can you bore under roads, railways, and creeks?
Yes. We design bore paths with proper bend radii and depth of cover for critical crossings, with frac-out contingency and traffic control as required.
Do you provide proof/mandrel and pressure testing?
Yes. We handle proofing/mandreling for conduit and pressure/hydro tests for pipelines, delivering logs and test records at close-out.
What does your close-out package include?
Fusion logs or weld/NDE docs as applicable, pressure/hydro results, photo logs, GPS as-builts, and restoration checklist for inspector approval.
How quickly can you mobilize in Oklahoma County?
We mobilize rapidly depending on 811 locates, permits, and materials. Share scope and timeline for the fastest compliant plan.
Ready to Build

Request an Oklahoma County HDD Proposal

Attach drawings, specify pipe/conduit, and provide your timeline. We’ll return a clear plan covering mobilization, pilot, reams, pullback, testing, and restoration.

Get a Quote